By: Staff Writer
September 08, Colombo (LNW): Sri Lanka Railways is set to enhance its rural transportation network by introducing new three-car diesel trains designed to operate on less-travelled tracks. This initiative aims to address the challenges posed by low passenger demand on certain routes, where traditional larger trains are underutilized.
Minister Nalinda Jayatissa announced that the Cabinet has approved the assembly of these new railcars locally. Each train will feature a diesel engine in every compartment, allowing for greater operational flexibility. The trains will be controlled by an advanced electronic system, ensuring efficient management and coordination. With a capacity to carry between 200 to 240 passengers, these trains are tailored to meet the specific needs of rural communities.
The decision to assemble the railcars domestically is expected to stimulate the local economy, create job opportunities, and reduce costs associated with importing foreign-made trains. This move aligns with the government’s broader strategy to promote self-reliance and bolster local industries.
In the past, Sri Lanka Railways experimented with rail buses—single-compartment vehicles capable of running on tracks. However, these units faced practical challenges, particularly in adhering to existing timetables. The new three-car trains are designed to integrate seamlessly into the current schedule, offering a more reliable and efficient alternative.
To ensure the success of this project, the government is actively seeking expressions of interest from both local and international companies capable of handling the design, manufacturing, and assembly of the railcars. This open bidding process aims to identify the most qualified partners and ensure the project’s timely and cost-effective completion.
The introduction of these three-car diesel trains represents a significant step forward in Sri Lanka’s efforts to modernize its railway infrastructure. By focusing on rural areas, the government aims to improve accessibility, reduce congestion on mainline services, and provide a more comfortable and efficient travel experience for passengers in underserved regions.
As the project progresses, further details regarding the selection of contractors and the implementation timeline are expected to be announced. Stakeholders and the public will be kept informed to ensure transparency and community involvement throughout the development process.