Colombo (LNW): Due to the reduced water releases for hydropower generation and lack of fuel availability for thermal power generation, it has been decided to resume two hour power cut since there is no adequate generation to cater energy and capacity deficit.
However, demand management measures may be excluded according to the inflow conditions of hydro catchment areas.

