A 200 megawatt capacity of power will be added to the national grid by the Sobadanavi Liquefied Neutral Gas (LNG) power plant which is generating 350 megawatts of power, Power Minister Pavithra Wanniarachchi said.
She made this observation during her observation tour into Sri Lanka’s first ever LNG power plant Sobadanavi in Kerawalapitiya.
The construction of this power plant is a project delayed for a very long time, the Minister went on, adding that the power crisis in the country would not have occurred, had it been built on time.