Another fault at Norochcholai Plant risking further power outages?

Date:

A fault has reportedly occurred in one phase of the Norochcholai Thermal power plant losing about 270 megawatts to the national grid.

Power and Energy Minister Kanchana Wijesekara in a tweet said that the situation can be remedied within five days.

Despite the fault making a heavy impact on the national grid it will not be necessary to extend the power cuts, he added, promising that necessary measures will be taken in managing the power demand.

MIAP

Share post:

spot_imgspot_img

Popular

More like this
Related

Why Sri Lanka’s Container Depots Need Modern Regulation?

Why Sri Lanka’s Container Depots Need Modern Regulation?

The X-Press Pearl Crisis: Technical Failures in Handling, Not Blame

The X-Press Pearl Crisis: Technical Failures in Handling, Not Blame

Legacy SIM Crackdown Tests Digital Trust Framework

Sri Lanka’s plan to mandate re-registration of SIM cards...

#ActiveColombo Vision Gains Momentum through Global Triathlon

Beyond tourism revenue, IRONMAN 70.3 Colombo is being deployed...