Another fault at Norochcholai Plant risking further power outages?

Date:

A fault has reportedly occurred in one phase of the Norochcholai Thermal power plant losing about 270 megawatts to the national grid.

Power and Energy Minister Kanchana Wijesekara in a tweet said that the situation can be remedied within five days.

Despite the fault making a heavy impact on the national grid it will not be necessary to extend the power cuts, he added, promising that necessary measures will be taken in managing the power demand.

MIAP

Share post:

spot_imgspot_img

Popular

More like this
Related

Why Sri Lanka Cannot Afford Moral Purity: Survival, Pragmatism, and the Hard Choices of a Small Nation

Why Sri Lanka Cannot Afford Moral Purity: Survival, Pragmatism, and the Hard Choices of a Small Nation

Ex-Minister Johnston Fernando Taken Into Custody Over Sathosa Lorry Probe

Ex-Minister Johnston Fernando Taken Into Custody Over Sathosa Lorry Probe

Mahaweli Authority Launches Islandwide Reservoir Safety Review Post-Ditwah

Mahaweli Authority Launches Islandwide Reservoir Safety Review Post-Ditwah

Renowned Journalist-Turned Lyricist Chandrasena Thalangama Passes Away

Renowned Journalist-Turned Lyricist Chandrasena Thalangama Passes Away