Operations at Samanala Wewa and Castlereagh power plants stopped

Date:

The Ceylon Electricity Board (CEB) has announced that the operations at the Samanala Wewa and Castlereagh power plants have been suspended, due to insufficient water levels in the reservoirs.

MIAP

Share post:

spot_imgspot_img

Popular

More like this
Related

World’s Rarest Sapphire Shines amid Sri Lanka Gem Trade Decline

World’s Rarest Sapphire Shines amid Sri Lanka Gem Trade Decline

India’s Travel Surge Reshapes Sri Lanka’s Tourism Recovery Path

India’s Travel Surge Reshapes Sri Lanka’s Tourism Recovery Path

CBSL Signals Policy Stability as Inflation Path Narrows in 2026

CBSL Signals Policy Stability as Inflation Path Narrows in 2026

Floods Hit the Poor First as Sri Lanka Faces Key Test after Cyclone Ditwah

Floods Hit the Poor First as Sri Lanka Faces Key Test after Cyclone Ditwah