Operations at Samanala Wewa and Castlereagh power plants stopped

Date:

The Ceylon Electricity Board (CEB) has announced that the operations at the Samanala Wewa and Castlereagh power plants have been suspended, due to insufficient water levels in the reservoirs.

MIAP

Share post:

spot_imgspot_img

Popular

More like this
Related

Sri Lanka’s 2026 Shock Test: Fiscal Space Meets Disaster Economics

Sri Lanka’s 2026 Shock Test: Fiscal Space Meets Disaster Economics

Cyclone Shock Puts Sri Lanka’s Vegetable Farming at Risk

Cyclone Shock Puts Sri Lanka’s Vegetable Farming at Risk

World Bank Bets on Sri Lanka’s Fragile Digital Leap

World Bank Bets on Sri Lanka’s Fragile Digital Leap

US Safety Manufacturer Plants Long-Term Industrial Bet in Sri Lanka

US Safety Manufacturer Plants Long-Term Industrial Bet in Sri Lanka