02 power plants face technical issues

Date:

The Kewaralapitiya West Coast Power Plant has been out of order since last night (12) due to a technical fault and has not been able to reconnect to the national grid.

The Kelanitissa Sojitz power plant also suffered a sudden breakdown last night and has been repaired and added to the system.

Meanwhile, it was reported that the operation of the Thulhiriya Power Plant has been suspended since last night due to lack of fuel.

According to CEB sources, the amount of fuel and naphtha required to generate electricity from thermal power plants is rapidly declining.

Share post:

spot_imgspot_img

Popular

More like this
Related

The Sorry State into Which Harini Has Fallen

The Sorry State into Which Harini Has Fallen

Gem Sri Lanka 2026 Set to Shine on Global Stage

Gem Sri Lanka 2026 Set to Shine on Global Stage

Private Sector Pensions on the Table as EPF Faces Overhaul

Private Sector Pensions on the Table as EPF Faces Overhaul

IMF Orthodoxy Risks Renewed Crisis for Sri Lanka

IMF Orthodoxy Risks Renewed Crisis for Sri Lanka