Application of renewable energy for power generation in doldrums due to CEB engineers’ conduct (VIDEO)

Date:

The failure of application of renewable energy on power supply was due to the actions of some electrical engineers in the Ceylon Electricity Board (CEB), divulged Engineer Noel Priyantha, Chairman of the Workers’ Union of the CEB, speaking to a briefing held today (12).

With the existing power crisis, the fact that the CEB can no longer depend of fossil fuels has become clear, Priyantha pointed out.

The President’s solution to the existing power crisis, which would be adaptation of renewable energy for the generation of power for 70 per cent of power supply by 2030, is the most ideal solution at this moment, he noted.

Priyantha added that the problem was not the lack of power plants in the country but the absence of dollars to import oil.

Share post:

spot_imgspot_img

Popular

More like this
Related

Police Launch Special Unit to Manage Flood and Storm Response

Police Launch Special Unit to Manage Flood and Storm Response

Western Province Warned of Possible Water Cuts as Kelani River Continues to Rise

Western Province Warned of Possible Water Cuts as Kelani River Continues to Rise

Cyclone ‘Ditwah’ Nearing Indian Coast as Sri Lanka Braces for Strong Winds and Heavy Rain

Cyclone ‘Ditwah’ Nearing Indian Coast as Sri Lanka Braces for Strong Winds and Heavy Rain

Officials Urge Residents Near Kelani River to Evacuate as Flood Threat Intensifies

Officials Urge Residents Near Kelani River to Evacuate as Flood Threat Intensifies