Power generation at Sapugaskanda Power Plant disrupted again!

Date:

Power generation at both generators of the Sapugaskanda Fuel Power Plant has been disrupted. Power generation has been disrupted since last night due to a lack of fuel.

The capacity of the national grid is 100 megawatts per day due to the disruption at this power plant.

The power plant had fuel only to generate electricity until 8 last night.

Meanwhile, power generation at the Kelanitissa Power Plant has resumed. The required stocks of diesel have been provided by the Ceylon Petroleum Corporation from yesterday.

Share post:

spot_imgspot_img

Popular

More like this
Related

Does the Epstein Scandal Reach Sri Lanka? Separating Fact from Speculation in a Global Controversy

Does the Epstein Scandal Reach Sri Lanka? Separating Fact from Speculation in a Global Controversy

Attorney General Dismisses Claims of Pulling Out of Overseas Legal Actions

Attorney General Dismisses Claims of Pulling Out of Overseas Legal Actions

Trade Unions Back Drive to Digitise Excise Operations and Boost Revenue

Trade Unions Back Drive to Digitise Excise Operations and Boost Revenue

Sri Lanka Bank on Home Comforts as Ireland Open World Cup Campaign

Sri Lanka Bank on Home Comforts as Ireland Open World Cup Campaign